Drilling Technique and Study for National Grade One Shaft with Multi-layer Underground Water Demonstration Monitoring Well
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU991.12

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the construction experience and concrete requirements of the project,design and construction were implemented for national grade one shaft with multi-layer underground water demonstration monitoring well for the first time,and a new technology,PVC-U plastic tube 'open hole well completion by four times',was adopted.The paper detailed the design,concrete technical measures and the final achievement.