Application of Filling Gravel Technology for Boreholes around Well in Workover Operation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU991.12

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper presents the method to increase well water flow rate of the tube well by recovering gravel layer through boreholes around well. It has been proved successful by the practice of a water supply tube well of a power plant.