Abstract:The paper introduces the blasting demolish technology used for a cement plant. The blasting is difficult because of the complicated environment and large blasting scale, especially small height-to-width ratio of double row cement kiln. Rational blasting parameters, full pre-demolish, rational blasting circuit were adopted in the engineering and a series of integrated control measures for damage from blasting were taken to ensure blasting safety and environmental protection.