Construction Technique of Working with Water in Subway Tunnel
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U455.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the under-construction case of the section between Shuangjing and Jingsong of No. 10 Line of Beijing Metro, analysis was made on the construction technology for single tunnel-single line-step excavation method. According to the analysis, the degree of influence to surrounding rock stability by technology of undercutting with shallow overburden, inclucling pre-strengthening, excavation sequence and step length, can be very clear.