Comprehensive Harnessing Construction Technique for High Side Slope Anchoring of Highway
DOI:
Author:
Affiliation:

Clc Number:

U417.12

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    介绍了桂柳高速公路K444+710~822上行线边坡锚固治理中锚索、锚杆、挂网等施工技术。

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:May 16,2007
  • Adopted:
  • Online:
  • Published: