Well Completion Technology for Jiuquwan Deep Geothermal Well in of Nanning City
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TE249

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Jiuquwan geothermal well was the first synchronous exploring and producing well, which took the deep tertiary fine sandstone as the main water intake region. The completion of the well filled the blank of geothermal resource exploitation in the Cenozoic Sedimentary basin with un-continuous reservoir. The well completion technology for the deep geothermal well was mainly introduced in this paper.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 04,2007
  • Revised:June 04,2007
  • Adopted:
  • Online:
  • Published:
Article QR Code