Abstract:Combined with engineering, in accordance with different geological and environment conditions, a study is carried out to the application scope of stak preloading and dynamic compaction in soft foundation treatment of a port area in Shenzhen, the design of construction parameter, the main technical problems arising from construction, as well as solutions to them. The examination and analysis are made on the reinforcement effect of the two methods. The result shows that the analyzer fulfills all design requirements.