Application of Reversed Construction Method in Vertical Shaft for Shield
DOI:
Author:
Affiliation:

Clc Number:

TE973.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    介绍了仪征-长岭原油管道黄石长江盾构穿越隧道北岸接收竖井工程软土段所采用的逆作法施工技术.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 19,2007
  • Revised:June 19,2007
  • Adopted:
  • Online:
  • Published: