Main Methods of Monitoring and Early-warning for Control of the Third Period of Geological hazard in Three Gorges Reservoir Region
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the main assignments of the monitoring and early-warning system engineering for control of geological hazard, monitoring and early-warning construction and the main methods. The significance was expatiated on effective monitoring in control engineering of geological hazard, and the application of a newly developed monitoring instrument was presented, which was used in monitoring for control of the third period of geological hazard in Three Gorges reservoir region.