Abstract:This paper introduced the characteristics of control works for geological hazard; and according to these characteristics, how to determine the cost in reason in the preceding construction was also presented. It should be recorded and vised if the original design was changed and the item was different to the contract or the bill quantity in order to get the possible claiming compensation later.