Abstract:With the case of ‘The First Crossing’ of Phase Ⅱ Project in Zhuhai-Zhongshan gas transportation pipeline, the paper expounds the main working contents and methods of soil and rock exploration for crossing large river with directional drilling, analyzes the project design, problems in rock and soil engineering and the countermeasure.