Discussion on Rock and Soil Exploration for Crossing Large River with Directional Drilling
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the case of ‘The First Crossing’ of Phase Ⅱ Project in Zhuhai-Zhongshan gas transportation pipeline, the paper expounds the main working contents and methods of soil and rock exploration for crossing large river with directional drilling, analyzes the project design, problems in rock and soil engineering and the countermeasure.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 23,2008
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code