Completion Technology of Seism Monitoring Well in Hebei Plain
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Seism monitoring under ground has higher accuracy with less noise jamming from the ground surface. The paper introduced the design of seism monitoring well in Hebei plain and key technology of well completion, pipe laying and well cementing. Proper well completion technology, pipe laying with bottom sealing and well cementing outside the pipe were used for the special demand of monitoring well.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 16,2008
  • Revised:
  • Adopted:
  • Online:
  • Published: