Technology Research on Drilling in Deep Alluvium with Case in Huangjinping Hydropower Station
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the requirement of curtain grouting test in deep alluvium of Huangjinping hydropower station, research was made on highly-difficult technology of drilling with 76m long case, and the borehole structure with two-step casing was put forward.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 10,2008
  • Revised:
  • Adopted:
  • Online:
  • Published: