Application of the Drilling Pilot Shaft Method for Shaft Construction in the Xiacun Mine
CSTR:
Author:
  • Article
  • | |
  • Metrics
  • | |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    Traditional shaft construction method was difficult with slow progress and high cost. Drilling pilot shaft has the obvious superiority to greatly reduce the construction period and the cost for a project with channel in lower part. This article discussed the key technology of drilling pilot shaft for shaft construction by the case of Xiacun mine.