Quality Control on Bored Grouting Pile Body of Main Tower of Dagoba in Famen Temple
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Pile foundation of the main tower of palms-together dagoba in Famen Temple was designed for 100 years project service life. The project construction was controlled in alkali-aggregate reaction, borehole completion, sedimentary dregs, cement grouting and post-pressure grouting.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 16,2008
  • Revised:
  • Adopted:
  • Online:
  • Published: