Abstract:The article introduces the construction technology and its advantages of the cast-in-place engaged pile taken as the exterior-protected structure used in the construction of Metro Line 1 Zhanong Kou-East Railway Station in the middle range of wind envelope well drilling project of Hangzhou, and sums up the measures to control the construction quality.