Elementary Introduction to Construction and Quality Control of Cast-in-place Engaged Pile
DOI:
Author:
Affiliation:

Clc Number:

TU471.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The article introduces the construction technology and its advantages of the cast-in-place engaged pile taken as the exterior-protected structure used in the construction of Metro Line 1 Zhanong Kou-East Railway Station in the middle range of wind envelope well drilling project of Hangzhou, and sums up the measures to control the construction quality.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 01,2009
  • Revised:February 01,2009
  • Adopted:February 01,2009
  • Online: September 02,2009
  • Published: August 25,2009