    Abstract:

    The paper introduced the construction process and the cautions in combined retaining structure with soil-nailed wall and the cable anchor, which were verified safe and reasonable in deep excavation retaining. Design parameters and engineering scheme could be timely adjusted according to the soil property revealed in the construction process with advantages of information construction in deep excavation construction.