Abstract:Based on the straight hole curtain grouting reinforcement for an electrolytic cell foundation settlement, the second cementation was applied for reinforcement and restoration by inclined hole. By the means of reasonable control on grouting pressure & grouting amount and with the intermittent grouting technology, every lifting level was monitored and controlled; electrolytic cell foundation settlement was successfully restored.