    With some project examples, this article put common quality problems of CFG pile into two kinds: the error surpasses the standard stipulation for the geometry size and the physical performance destroyed and expired. And from this point, the influence to the bearing capacity of composite foundation was qualitative analyzed,primary cause of these problems and the countermeasures were put forward, and some suggestions were made on equipment and technology.