Well Leakage Treatment on 244.5mm Case of Well Lishen 1 before Cementing
DOI:
Author:
Affiliation:

Clc Number:

TE256

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Because of high density of cementing slurry, borehole leakage often occurs while casing cementing operated in the area with low formation bearing pressure. Pressure sealing before well cementing is important to guarantee cementing quality and drilling design. Cementing of Well Lishen 1 was successfully operated by the analysis on the leakage zone and rational leakage stopping.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 24,2009
  • Revised:March 24,2009
  • Adopted:June 15,2009
  • Online: September 02,2009
  • Published: August 25,2009