Application of Ultra-deep Pre-stressed Anchoring Cable in Landslide Control Project in the Three Gorges Reservoir
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P642.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Comprehensive treatment with anchor lattice, retaining wall and anti-slide pile was adopted for landslide control project in Three Gorges Reservoir. In order to increase the slide stability, it is important to construct the ultra-deep pre-stressed anchoring cable at top end of the anti-slide pile and increase the normal stress of slip band. The paper introduced the construction of ultra-deep pre-stressed anchoring cable, borehole for anchor cable, grouting and tension construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 27,2009
  • Revised:March 27,2009
  • Adopted:August 22,2009
  • Online: November 16,2009
  • Published: October 25,2009
Article QR Code