Construction Technology of Drilling in South Section of Sijiaying Iron Mine
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the formation characteristics and construction requirement of Sijiaying iron mine, both wire-line coring and percussive-rotary wire-line drilling were adopted combined with diamond bit and washing fluid technology, drilling was successful.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 30,2009
  • Revised:August 26,2009
  • Adopted:September 19,2009
  • Online: November 16,2009
  • Published: October 25,2009
Article QR Code