Abstract:The tower foundation engineering for 500kV power transmission line long-span over Yellow River was constructed with several technologies gathering and consisted of underground part and above-ground part. The paper discussed the important construction procedure, technical difficulties and special control method of bored pile construction, supporting system selection, elevated pile cap template support, anchor bolt placing and large-volume bearing platform concreting.