Abstract:In the old powerhouse extension, grouting reinforcement is processed for foundation. According to the site situation and in view of the karst cave geological features, reasonable grouting parameters and the hole position arrangement were selected to reinforce the foundation with appropriate drilling methods and grouting technology; the measures for special situation was also proposed. By the test after grouting, it was proved that the grouting reinforcement was successful.