Composite Soil-nailed Wall Retaining Construction for the Coal-storing Pit in Complex Environment
DOI:
Author:
Affiliation:

Clc Number:

TU472

Fund Project:

The National Natural Science Foundation of China(No.50709030);The Natural Science Foundtion of The Education Department of Henan Province(No. 2008A410002, 2007570011)。

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For the coal-storing pit surrounded by extremely complex environments, the design scheme is related to the normal production, safety and late maintenance works. In order to improve the supporting effect and avoid repeated maintenance, combined support with original supporting by the 8th Coal Mine of Pingdingshan, pile-anchor, soil-nailed meshing-concrete spraying and pre-stressed soil-nailing reinforcement was adopted with good effect. Based on the observation by information-construction method, the horizontal displacement of foundation pit and the settlement of the surrounding buildings are in a safe range, the safety of the foundation pit and the surrounding buildings were ensured.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 29,2009
  • Revised:April 29,2009
  • Adopted:August 27,2009
  • Online: November 12,2009
  • Published: October 25,2009