Construction Technology of Large Diameter Karst Water Well
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU991.12

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the construction case of a large diameter water supply well in a water plant of Guangxi, the paper detailed air downhole hammer drilling, hole reaming, borehole wall protection and construction technology in borehole with large diameter and serious water flow in complicated karst formation.