Construction Technology of Large Diameter Karst Water Well
DOI:
Author:
Affiliation:

Clc Number:

TU991.12

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the construction case of a large diameter water supply well in a water plant of Guangxi, the paper detailed air downhole hammer drilling, hole reaming, borehole wall protection and construction technology in borehole with large diameter and serious water flow in complicated karst formation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 05,2009
  • Revised:May 05,2009
  • Adopted:July 04,2009
  • Online: July 27,2009
  • Published: July 25,2009