Slope Treatment Measures for Nei-Yi Expressway (K43 +200~K43 +256)
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduced slope treatment scheme and construction measures for Nei-Yi expressway (K43+200~K43+256). Besides pre-stressed anchoring cable, different treatment measures for each unstable rock mass were also applied: crack filling, rock cavity sealing and unstable rock support. It has been proved that the treatment scheme and construction measures are reasonable by time tested for more than 2 years.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 09,2008
  • Revised:
  • Adopted:
  • Online:
  • Published: February 25,2009
Article QR Code