Abstract:The paper introduced slope treatment scheme and construction measures for Nei-Yi expressway (K43+200~K43+256). Besides pre-stressed anchoring cable, different treatment measures for each unstable rock mass were also applied: crack filling, rock cavity sealing and unstable rock support. It has been proved that the treatment scheme and construction measures are reasonable by time tested for more than 2 years.