Construction Practice of Bored Cast-in-place Pile Post Grouting in Hangzhou
DOI:
Author:
Affiliation:

Clc Number:

TU473.1+4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Bored cast-in-place pile post grouting can promote the bearing capacity of single pile, guarantee the pile construction quality and save construction cost, which fit to bored cast-in-place pile engineering in bearing layers of sandy gravel and gravel soil. With the field case, the paper detailed the reinforcement mechanism, construction technology and treatment measures for construction difficulties.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 08,2009
  • Revised:July 08,2009
  • Adopted:November 14,2009
  • Online: January 11,2010
  • Published: December 25,2009