Application of Calcium-treated Mud in Construction of Bored Cast-in-place Pile in Salt Formation
DOI:
Author:
Affiliation:

Clc Number:

U443.5+4;P634.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Effective calcium-treated mud was testing prepared for the underground salt-water environment with high sodium ion, and the serious pile hole shrinkage and un-position of steel reinforcement cage were solved. It can be the reference for the construction in the similar formation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 08,2009
  • Revised:July 08,2009
  • Adopted:October 27,2009
  • Online: January 11,2010
  • Published: December 25,2009