Abstract:The borehole of Guanzhuang gold field in Yuanling was drilled with high inclination(45°), complex rock lithology, 10-70m fracture zone, serious leakage and block-falling. Drilling bit, construction technology, mud configuration and confection process were studied and selected to avoid the accidence in borehole with satisfied core recovery and increased drilling efficiency.