Construction Practice of Jet-grouting Pile Water-proof Curtain in Sea Reclamation Region
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the formation of sea reclamation region, backfill only experienced short time with most filling material of excavated-stone, so the loose structure, large interstice, smooth connectivity of underground water & sea water and strong scouring by tidal action existed, which brought difficulties in borehole completion and slurry solidification for water-proof curtain construction. Based on the detailed analysis on the engineering geological condition, practice and innovation were carried on for hole boring technology and construction sequence of jet-grouting pile. Good construction effect was achieved with reasonable improvement and optimization.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 12,2008
  • Revised:
  • Adopted:
  • Online:
  • Published: March 25,2009