Blasting Design on Yeshanhe Dock Tunnel
DOI:
Author:
Affiliation:

Clc Number:

U615.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Blasting requirements of Yesanhe dock tunnel were analyzed, through the corresponding experience formula calculation, the tunnel blasting parameters were determined to keep vibration velocity in the permit safety of the nearby buildings and promise excavation efficiency.