Risk Analysis on Entrance with Shallow-buried and Unbalanced Pressure of Jiqingling Tunnel and the Measures
DOI:
Author:
Affiliation:

Clc Number:

U455.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the engineering case in Jiqingling tunnel, risk analysis was made on the construction of tunnel entrance in poor geological condition with shallow-buried and unbalanced pressure. Integrated prevention measures for geological diseases were put forward with early support strengthening, short cycling excavating and early support closing.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 19,2009
  • Revised:November 26,2009
  • Adopted:November 26,2009
  • Online: February 04,2010
  • Published: January 25,2010