Rapid Positioning and Construction Technology for Above-water Bored Cast-in-place Pile in the Nile of Sudan
DOI:
Author:
Affiliation:

Clc Number:

U443.15+4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Unpowered rectangular floating pontoon was taken as construction platform while constructing the bored cast-in-place pile in the Nile of Sudan, low cost and short construction period were achieved. The paper introduced the construction of floating pontoon and the design & construction technology for bored cast-in-place pile.