Application of Shotcrete Bolt and Pile-anchor Retaining in a Deep Excavation Engineering
DOI:
Author:
Affiliation:

Clc Number:

TU473.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Because of the complicated geological conditions and the surrounding environment in the excavation site of Zhongnan Gardon Hotel, combined supporting method was adopted with shortcrete bolt and pile-anchor retaining. Safety for excavation construction, surrounding buildings and underground pipeline was ensured with lower cost and shorter construction period. The project set a successful case for similar engineering construction.