Ventilation Technology and Numerical Simulation for the Construction of Extra-long Expressway Tunnel Blind Heading without Track Transportation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U435.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The ventilation layout and ventilation equipment of the longest expressway tunnel (Maijishan tunnel)construction with blind heading interiorly were introduced, the relevant parameters were calculated according to the standard methods, the verification of numerical simulation for the construction ventilation scheme was processed based on the finite element fluid dynamics software FLUENT. Some problems encountered during the ventilation process and the solutions were described to obtain a good tunnel ventilation effect and create a comfortable and efficient work environment.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 28,2009
  • Revised:January 02,2010
  • Adopted:January 03,2010
  • Online: March 30,2010
  • Published: March 25,2010
Article QR Code