Construction Technology of Pile Hole for Shanghai-Chengdu High Speed Railway Overpassing Hanjiang Super-long Bridge
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U473.15+4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introcuced the drilling construction technology of Shanghai-Chengdu high speed railway in karst strutum, together with the equipments selection, technical parameters determination and the treatment & prevention for commom accidences of drilling construction in such strutum.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 28,2009
  • Revised:January 01,1900
  • Adopted:December 08,2009
  • Online: February 09,2010
  • Published: February 25,2010
Article QR Code