Abstract:By the analysis on the shield construction method and machinery allocation for Minzhi to Wuhe tunnel interval of Shenzhen metro No.5 Line, subway tunnel shield supporting equipment selection for subway tunnel shield interval rapid construction was summed up to accumulate experience the similar project.