Construction Practice of Super-long Pre-stressed Tubular Pile
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on “Pre-tensioned Pre-stressed Concrete Tubular Pile”(GB 13476-1999)and “Design Structure Standard Alta”(2002 Zhejiang G22), the length-diameter ratio of frictional pre-stressed tube pile should less than 100, and the length-diameter ratio of end bearing pile or frictional end bearing pile should less than 80 while getting through a certain thickness in hard soil. The paper introduced an engineering case of super-long pre-stressed tubular pile in silty and sandy soil with the longest design pile length of 60m,diameter of 550mm and 600mm, connected by 4 piles of 15m, the length-diameter ratio was more than 100. Beneficial exploration was made on construction of super-long pre-stressed tube pile in sand and silt layer based on this case in Hangzhou City.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 09,2008
  • Revised:
  • Adopted:
  • Online:
  • Published: April 25,2009