Cause of Static Pressure Pile Floating and Repressing Treatment
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The foundation of Nanyafengqing Garden was designed of static pressure pre-cast tube pipe; pile floating was detected after construction. Through the cause analysis, repressing treatment scheme was applied with parameters satisfying the design requirement.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 16,2008
  • Revised:
  • Adopted:
  • Online:
  • Published: April 25,2009