Implementation and Management of Drilling and Logging Engineering of Wenchuan Earthquake Scientific Drilling Project
DOI:
Author:
Affiliation:

Clc Number:

P634

Fund Project:

科技部科技支撑计划“汶川地震断裂带科学钻探(WFSD)”项目

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This article introduces the general situation of Wenchuan earthquake scientific drilling project and the progress of drilling and logging engineering of the project. The characteristics of earthquake scientific drilling are analyzed and the organizational management for the implementation of the holes WFSD-1, WFSD-2 and WFSD-3-P is summarized. On the basis of organization and management experiences of Chinese Continental Scientific Drilling Project, the improvement measures on the organizational management for the Wenchuan project were discussed and put forward on the consideration of the exploration, complicated formations and engineering plan with frequent changes to meet the requirement of geoscientific research.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 30,2009
  • Revised:November 30,2009
  • Adopted:November 30,2009
  • Online: January 11,2010
  • Published: December 25,2009