Abstract:In order to make clear the karst cave distribution beneath roadbed at Yesanguan section of 318 national highway, GPR was used for delineating. By the analysis on the stability of the karst disturbed zone, the jet grouting method was chosen for the reinforcement. The strengthening region was detected again, and the effect is very significant.