Construction Practice of Large Diameter Under-reamed Bored Pile
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduced the construction method of large diameter underreamed bored pile with engineering case, analyzed the main characteristics of the project and discussed the main technical measures.