    High technical standard, large construction quantities, strict requirements on civilized construction and large construction disturbances were the characteristics of Beijing-Shanghai high-speed railway engineering. The paper summed up the pile foundation construction technology in the 3-contract section and discussed the key steps for quality control on cast-in-place pile.