Borehole Deviation Correcting and Controlling Technical Measures in Heishan Mining Area of Chengde
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Azimuth error and borehole top angle oversize were the difficult problems in drilling construction in Heishan mining area of Chengde. LZ-73(89)whipstock was used for deviation correction with good effect. Based on the analysis on the causes of borehole running deviation and summary on the construction experience, technical measures of borehole deviation prevention were put forward.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 26,2009
  • Revised:April 29,2010
  • Adopted:May 05,2010
  • Online: May 26,2010
  • Published: May 25,2010
Article QR Code