Abstract:Because of the blockfalling, collapsing, local oversizing and more sediment in water sensitive formation, drilling broken and burying drilling occurred in the boring construction in a phosphate mine in Guizhou. Small diameter cone bit positioning deflection by wireline coring with steel ball supporting was used to solve the problem economically.