Application Practice of Optimized and Fast Drilling Comprehensive Techniques in Xi 50-54 Well
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TE242

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to geological characteristics and drilling difficulties in Haita district, drilling technical study and field test were made for drilling speed-rising plan. Technical difficulties caused by collapsing of upper-part formation, easy deviation in mid-part formation and hard bottom part formation were solved with the optimized and fast drilling realized. The paper analyzed the field application in borehole structural optimization, optical selection on drilling bit and parameters and compound drilling with the case of Xi 50-54 well, and it showed the great improvement on penetration rate and drilling period.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 29,2009
  • Revised:December 29,2009
  • Adopted:January 21,2010
  • Online: July 07,2010
  • Published: June 25,2010
Article QR Code