Abstract:According to the cable opening and hole construction in Yangchangwan coal mine, the optimum technology and technical requirement and effective prevention & treatment on broken leakage formation for special large diameter drilling construction in Ningdong mine were summed up. Advanced non-return valve cementing technology was successfully applied for large diameter borehole cementing process, and treatment methods of large diameter downhole trouble were put forward.