Application of Foundation Pit Dewatering by Small Pumping Amount in Multiple Well Points
DOI:
Author:
Affiliation:

Clc Number:

TU46+3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduced the groundwater level control by continuous small pumping amount in multiple well points for the foundation pit construction with full water recharge and large drawdown, which made the curved surface of dewatering funnel flat, reduced the land subsidence around the foundation pit and obtained good dewatering result.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 06,2010
  • Revised:March 10,2010
  • Adopted:April 01,2010
  • Online: May 26,2010
  • Published: April 25,2010