Technical Difficulties in Drilling Construction of Complex Formation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to solve the technical difficulties of complex formation drilling for coal exploration in Xuyong dam of Sichuan, analysis was made on the encountered complex formations. The paper introduced the formation characteristics, borehole construction, washing fluid, wall protection & leakage control and the application of new technology.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 14,2010
  • Revised:January 14,2010
  • Adopted:March 02,2010
  • Online: May 26,2010
  • Published: May 25,2010
Article QR Code